Kitchen design + build · The Triangle, NC

Kitchens

Layout, cabinetry, lighting, and utilities planned together, then built by the same team that drew them.

Typical range
$50k to $85k for a full rework
On-site timeline
6 to 8 weeks for a rework
Planning phase
About 5 weeks to a fixed proposal
Service area
The Triangle, NC
Wide North Carolina kitchen with a navy island, clear working aisles, and coordinated lightingBuilt result · coordinated from one plan

What we solve

Make the footprint work before selecting finishes.

A successful kitchen starts with the way people move, prep, cook, clean, and gather. We test those routines against the room’s openings, appliance doors, utility locations, and realistic cabinet dimensions.

The result is a buildable plan that connects the visible choices to the work behind the wall.

Kitchens in Triangle homes

Plan the utilities before the cabinets.

Triangle kitchens sit over crawlspaces, slabs, basements, and finished rooms, sometimes within the same neighborhood. Those conditions decide how far a sink can move, where a hood can exhaust, whether the panel can support new appliances, and what must be opened to reach the work.

Finished kitchen storage wall with a refrigerator, full-height pantry cabinets, and an illuminated counter niche
Built storage wall · appliance clearances, filler dimensions, lighting, and daily storage coordinated together

Give cooking air a direct path outside.

The hood, cabinet layout, duct size, framing route, and exterior termination need to agree before anything is ordered. We draw that path early so the duct does not end in a recirculating compromise or collide with a joist after the cabinets arrive.

Check power before choosing appliances.

Induction cooking, double ovens, speed ovens, refrigeration, and added countertop loads can change circuit and panel requirements. We compare the appliance schedule with the existing service early, then coordinate receptacles and lighting with the final cabinet plan.

Map what runs below and above the room.

A crawlspace may make a drain relocation more direct, while a slab or finished ceiling below can limit the route. Joists, plumbing vents, HVAC ducts, and structural beams all shape the layout. We verify those conditions before pricing an island sink or moving a wall.

Same room. Every move accounted for.

Drag to compare the same Triangle kitchen from the same doorway.

The same Triangle kitchen before renovation, with golden oak cabinetry, almond appliances, laminate counters, and patterned vinyl flooring
The Triangle kitchen after renovation, viewed from the same doorway with white shaker cabinetry, quartz counters, light oak flooring, and a seated island

Same footprint, replanned. Drag to compare the working zones before and after.

The plan, working in the room

One model. Six decisions that make the kitchen work.

The same clearances, utility locations, and fixture relationships are carried from the measured room into construction. Follow each decision from model to finished kitchen.

Architectural kitchen coordination model traced to the built room from the same camera position, with the range and hood on the left wall, sink under the center window, refrigerator right of center, dining-room opening at right, and wood island with three seats
Coordination modelSame room geometry · checked before ordering
Finished kitchen photograph with the same six coordinated decisions marked
Built resultEvery decision still has a visible job

Hover, focus, or tap a decision to trace it from the model into the finished room.

Before you email anyone

Straight answers first.

How long

About 15 to 21 weeks door to door. 6 to 8 of them on site.

Planning takes about 5 weeks, the construction slot is typically 4 to 8 weeks after the fixed proposal, and a rework runs 6 to 8 weeks on site. Planning is a paid engagement, credited in full against construction, and the drawings are yours either way.

How much

Most full reworks land between $50k and $85k.

Refreshes start near $25k. Rebuilds run $90k and up. The full tiers below show what changes with the scope.

How disruptive

Floor protection and dust containment go in before the old kitchen is removed and utilities are made safe.

The build sequence shows how protection, demolition, and utility work are ordered.

What kitchens cost here

Three tiers, honest numbers.

Refresh.

Same layout, new surfaces and lighting.

$25k to $45k3 to 4 weeks

Rework.

New layout inside the same footprint.

$50k to $85k6 to 8 weeks

Rebuild.

Walls move, structure changes.

$90k and up9 to 14 weeks

What moves the number: appliance grade, stone selection, and what we find behind the wall. The last one has a written policy, described below.

Discovered conditions

When we find something behind the wall.

Photos the same day. Written options with prices within two business days. Nothing proceeds until you approve it in writing. The full policy is on the process page.

The outcome

Clear decisions before demolition, fewer surprises during construction, and a kitchen planned around the way the home is actually used.

How payment works

A deposit reserves your construction slot. The balance is paid at milestones tied to inspections, not to the calendar. The final payment comes after the punch list is closed, not before.

Kitchen FAQ

Questions to answer before the cabinet order.

These are the practical issues that shape kitchen projects across Raleigh, Durham, Chapel Hill, Cary, Apex, and Morrisville. We confirm the home-specific answer during field verification.

Review the planning process
Does a kitchen remodel need a permit?

Many full remodels do. In Raleigh, interior kitchen renovations are handled as residential alterations or repairs, with electrical, plumbing, and mechanical work included as the scope requires. Other Triangle jurisdictions use their own process. We identify the authority and inspections before setting the construction schedule.

Can we stay in the house without a working kitchen?

Usually, with a specific plan. We identify a temporary location for the refrigerator, microwave, coffee maker, and basic cleanup; protect the route through the home; and schedule water or power shutdowns in advance. The kitchen itself remains a construction zone and is separated from daily living as much as the house allows.

Does the range hood need to vent outdoors?

For effective removal of heat, moisture, and cooking byproducts, a direct outdoor duct is the preferred plan and may be required by the selected equipment and project conditions. We coordinate the hood, duct route, framing, exterior termination, and any related mechanical requirements before cabinetry is ordered.

Can the sink or dishwasher move to an island?

Often, but the drain, vent, water, power, and floor structure need a workable route. Crawlspace access can make the move more direct; a slab or finished room below can make it more invasive. We check the route and appliance clearances before treating the island location as fixed.

Will the existing electrical panel support new appliances?

It depends on the existing service, available capacity, and final appliance schedule. Induction ranges, wall ovens, speed ovens, and added circuits can change the load. We review those requirements early enough to include a panel or service change in the scope if one is needed.

Will North Carolina humidity affect cabinets or wood flooring?

Wood products move as indoor moisture changes. Materials should be stored in conditioned space, acclimated and installed to manufacturer requirements, and protected from active construction moisture. Stable indoor humidity, correct expansion allowances, and prompt plumbing leak response matter more than choosing a species by appearance alone.

Which decisions have to be made earliest?

Cabinet layout, appliance specifications, sink and faucet, ventilation equipment, and major lighting locations drive the rough work and long-lead orders. Countertop color and hardware can follow later. We sequence the decision list so one late finish choice does not hold up utilities or cabinet production.

What happens if you find old wiring, plumbing, or damage?

We photograph the condition, explain whether it is a required correction or an optional improvement, and provide written price and schedule impacts before proceeding. Common findings include prior unpermitted alterations, undersized circuits, leaking valves, or framing cut for old utilities. Nothing changes on a verbal go-ahead.

Want a clearer starting point?

Start with what is not working.

You do not need drawings or a Pinterest board. Note the thing that gets in the way every night at dinner.

Check launch status